1 2001–2005 SHIMIZU-ITD J V
• Temporary Road Construction Work
• Temporary Workshop Construction
• Supply & Rent, Rupsha, Khulna
Mr. Niwat Janpitakpong
Construction Manager
2 2001–2005 TEISEKI DRILLING CO., LTD.
• Rupsha Bridge Construction Work
• Supply of River Piling Work, Rupsha, Khulna
Raj Mishra
P&M Manager
3 2005–2007 CHINA OVERSEAS ENGINEERING CO. LTD
• Road Construction and
• Culvert Construction, Fokirhut, Bagerhat, Khulna
Lee Procurement
Construction Manager
4 2011–2023 FIRST DHAKA ELEVATED EXPRESSWAY (FDEE) CO., LTD.
• Sand filling work
• Temporary Road Construction Work
• Imported & general material supply
• Heavy Equipment Rent, Kawla, Dhaka
• Pile Cap, Short Column, Deck Slab & Barrier Construction
Mr. Niwat Janpitakpong
Construction Manager
5 2012–2015 KUBOTA–MARUBENI JOINT VENTURE
KARNAFULI WATER SUPPLY PROJECT (KWSP) C-2, CWASA
• Stock yard preparation
• DI pipe laying: DN1200, DN900, DN700, DN400
• HDPE pipe laying
• Rail/river crossings, chamber construction
• Pressure Test
CWASA, Chattogram
Akira Shirai
Project Manager
6 2015–2017 HUBEI INDUSTRIAL CONTRACTION GROUP CO., LTD.
CWSSIP/W-8, Chattogram
• DI & HDPE pipe installation
• Chamber construction
• Fittings and pressure testing
CWASA, Chattogram
Huang Bo
Project Manager
7 2016–2017 QINGDAO NO.1 CONSTRUCTION GROUP CO., LTD
Padma Water Treatment Plant Project (Pipeline Construction)
• DN2000 Ductile Cast Iron Pipe Installation
• Chamber construction work
• Pressure Test of laid pipe, DWASA, Munshiganj, Dhaka
Zhang Zhaoyang
Project Director
8 2017–2018 KUBOTA KOLON J V
Karnafully Water Supply Project Phase-2
• Heavy Equipment Rent & Supplier
Location: CWASA, Chattogram
Masatoshi Sano
HES Engineer
9 2017–2020 LARSEN & TURBO LIMITED, CONSTRUCTION
KHULNA MONGLA RAIL BRIDGE PROJECT
• Heavy Equipment Rent & Supplier
Location: Lobonchora, Khulna
Mr. Akash Mishra
10 2017–2020 OSJI JOINT VENTURE
• Construction of Kanchpur, Meghna, Gumti Bridge
• Supply Japanese Machinery
• Supply Concrete Machinery
Location: Meghna, Sonargaon, Dhaka
Mr. Tsutomu Ippommatsu
11 2018–2019 Meghna Industrial Economic Zone
• Supply & Installed the IT Materials
Md. Abdur Rouf
12 2018–2022 Takken Abdul Monem-Abenikko JV
(DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT, CP 05)
• Supply Work, Electrical & Office Area, Earth Grounding Work
Mr. Ogura
Project Manager
13 2018–2022 SMCC-ITD JV
(DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT, CP 06)
• Supply Work, Electrical, Civil Work, Earth Grounding Work
Panu Pong
Project Manager