Completed Projects
Sl. No. | Project Status | Contractor, Project Title, Description & Location | Reference Person |
---|---|---|---|
1 | 2001–2005 |
SHIMIZU-ITD J V • Temporary Road Construction Work • Temporary Workshop Construction • Supply & Rent, Rupsha, Khulna |
Mr. Niwat Janpitakpong Construction Manager |
2 | 2001–2005 |
TEISEKI DRILLING CO., LTD. • Rupsha Bridge Construction Work • Supply of River Piling Work, Rupsha, Khulna |
Raj Mishra P&M Manager |
3 | 2005–2007 |
CHINA OVERSEAS ENGINEERING CO. LTD • Road Construction and • Culvert Construction, Fokirhut, Bagerhat, Khulna |
Lee Procurement Construction Manager |
4 | 2011–2023 |
FIRST DHAKA ELEVATED EXPRESSWAY (FDEE) CO., LTD. • Sand filling work • Temporary Road Construction Work • Imported & general material supply • Heavy Equipment Rent, Kawla, Dhaka • Pile Cap, Short Column, Deck Slab & Barrier Construction |
Mr. Niwat Janpitakpong Construction Manager |
5 | 2012–2015 |
KUBOTA–MARUBENI JOINT VENTURE KARNAFULI WATER SUPPLY PROJECT (KWSP) C-2, CWASA • Stock yard preparation • DI pipe laying: DN1200, DN900, DN700, DN400 • HDPE pipe laying • Rail/river crossings, chamber construction • Pressure Test CWASA, Chattogram |
Akira Shirai Project Manager |
6 | 2015–2017 |
HUBEI INDUSTRIAL CONTRACTION GROUP CO., LTD. CWSSIP/W-8, Chattogram • DI & HDPE pipe installation • Chamber construction • Fittings and pressure testing CWASA, Chattogram |
Huang Bo Project Manager |
7 | 2016–2017 | QINGDAO NO.1 CONSTRUCTION GROUP CO., LTD Padma Water Treatment Plant Project (Pipeline Construction) • DN2000 Ductile Cast Iron Pipe Installation • Chamber construction work • Pressure Test of laid pipe, DWASA, Munshiganj, Dhaka |
Zhang Zhaoyang Project Director |
8 | 2017–2018 | KUBOTA KOLON J V Karnafully Water Supply Project Phase-2 • Heavy Equipment Rent & Supplier Location: CWASA, Chattogram |
Masatoshi Sano HES Engineer |
9 | 2017–2020 | LARSEN & TURBO LIMITED, CONSTRUCTION KHULNA MONGLA RAIL BRIDGE PROJECT • Heavy Equipment Rent & Supplier Location: Lobonchora, Khulna |
Mr. Akash Mishra |
10 | 2017–2020 | OSJI JOINT VENTURE • Construction of Kanchpur, Meghna, Gumti Bridge • Supply Japanese Machinery • Supply Concrete Machinery Location: Meghna, Sonargaon, Dhaka |
Mr. Tsutomu Ippommatsu |
11 | 2018–2019 | Meghna Industrial Economic Zone • Supply & Installed the IT Materials |
Md. Abdur Rouf |
12 | 2018–2022 | Takken Abdul Monem-Abenikko JV (DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT, CP 05) • Supply Work, Electrical & Office Area, Earth Grounding Work |
Mr. Ogura Project Manager |
13 | 2018–2022 | SMCC-ITD JV (DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT, CP 06) • Supply Work, Electrical, Civil Work, Earth Grounding Work |
Panu Pong Project Manager |
Office Address
- Head Office: Sayed Plaza, Level # 4 (B&C), House #534 & 538, Evercare Hospital Road, Bashundhara, Vatara, Dhaka-1212
- Chittagang Office: Akhi Place, House #1, Flat # 3 D 2, Block #G, Lane #2, Road # 1, Halishahar, Chattogram
- Khulna Office: 47 Upper Jessore Road (Shop 5 & 6), Khulna
- +88 01711-805383
- rehnuma.corp.bd@gmail.com
Facebook
Twitter
LinkedIn