Project Status Contractor, Project Title, Description & Location Reference Person
2020–Till Now Gandharbpur Water Treatment SNC
Main Contractor: SUEZ INTERNATIONAL OTV-VEOLIA JV
1600mm dia Ductile Iron dual Pipeline installation work 22 Km (approx.) in double length (single length should be 44 Km approx.), including Pressure test, Small Chamber construction, Small Village Road Crossing work.
Mr. Hasan
Construction Manager
2022–Till Now Sewerage Network for North-Middle Halishahar
and adjoining areas of Chattogram Sewerage Treatment Plant
300 cu.m/day Fecal Sludge Treatment Facility and Design, Construction, Supply, Installation, Testing and Commissioning of 100mld Metropolitan on Turnkey Basis. (PESSCM-1/W1)
Main Contractor: TAEYOUNG E&C
Pipeline Networking
Shaft Construction (Various Types)
Mr. Aan
Construction Manager
2025 Till Now China Geo-Engineering Corporation Project Execution Unit (PEU)
Type of Pipes and Fittings: HDPE PN10 Pipe and Fittings
(Pipes Diameter: OD355, OD400, OD450, OD560, OD630, OD710 and OD800)
Mr. Yang Zhenyu
Project Director
2025 Till Now CCECC Project in Maniknagar, Dhaka Hasib Ahasan Chowdhury
Project Co-ordinator