Project Status | Contractor, Project Title, Description & Location | Reference Person |
---|---|---|
2020–Till Now |
Gandharbpur Water Treatment SNC Main Contractor: SUEZ INTERNATIONAL OTV-VEOLIA JV 1600mm dia Ductile Iron dual Pipeline installation work 22 Km (approx.) in double length (single length should be 44 Km approx.), including Pressure test, Small Chamber construction, Small Village Road Crossing work. |
Mr. Hasan Construction Manager |
2022–Till Now |
Sewerage Network for North-Middle Halishahar and adjoining areas of Chattogram Sewerage Treatment Plant 300 cu.m/day Fecal Sludge Treatment Facility and Design, Construction, Supply, Installation, Testing and Commissioning of 100mld Metropolitan on Turnkey Basis. (PESSCM-1/W1) Main Contractor: TAEYOUNG E&C Pipeline Networking Shaft Construction (Various Types) |
Mr. Aan Construction Manager |
2025 Till Now |
China Geo-Engineering Corporation Project Execution Unit (PEU) Type of Pipes and Fittings: HDPE PN10 Pipe and Fittings (Pipes Diameter: OD355, OD400, OD450, OD560, OD630, OD710 and OD800) |
Mr. Yang Zhenyu Project Director |
2025 Till Now | CCECC Project in Maniknagar, Dhaka |
Hasib Ahasan Chowdhury Project Co-ordinator |
Office Address
- Head Office: Sayed Plaza, Level # 4 (B&C), House #534 & 538, Evercare Hospital Road, Bashundhara, Vatara, Dhaka-1212
- Chittagang Office: Akhi Place, House #1, Flat # 3 D 2, Block #G, Lane #2, Road # 1, Halishahar, Chattogram
- Khulna Office: 47 Upper Jessore Road (Shop 5 & 6), Khulna
- +88 01711-805383
- rehnuma.corp.bd@gmail.com
Facebook
Twitter
LinkedIn